Railroad Crossing Student housing
In partnership with Samet Corporation, this project included large-scale concrete work for a new 8-story student housing development at SC State University, including pours for spread footings, perimeter walls, stairwells, the elevator pit, and freestanding concrete core walls forming the elevator shaft.
Scope also included a major foundation pour featuring 15 spread footings, perimeter footings, and reinforced pier systems with rebar cages, anchor bolts, and starter bars.
ONE WESTSIDE
In partnership with Block Companies, we are providing large scale concrete solutions for this new development in Chattanooga, TN. Our team is leveraging a combination of formwork systems to drive efficiency and quality. The wall crew is utilizing Doka Frami for the cores, hand-setting steel ply for the shear walls, and MevaLite for the columns—allowing for flexibility and precision across multiple scopes.
We’re also deploying the PERI PD5 hybrid 10K shoring system, which has proven to be extremely lightweight and efficient, helping our crews maintain productivity while ensuring a safe working environment.
The Vintage 1959
Evans Contracting Group is excited to announce our latest project with TDK Companies in Murfreesboro, Tn. The Vintage 1959 development will be seamlessly connected to The Exchange, a popular destination anchored by Char restaurant and Trader Joe’s, along with other retail and office offerings. It’s a strategic move that reflects Murfreesboro’s rapid growth and its reputation as one of Tennessee’s most desirable places to live.
Daniel Island apartments
Evans Contracting Group is proud to announce our latest awarded project on Daniel Island in Charleston, SC for Carolina Multifamily Construction newest apartment development. This project consists of a parking deck wrapped with 242 apartment units, and we’re excited to be part of another high-quality multifamily development in the Lowcountry.
Trinity Flats
Trinity Flats in Nashville, TN for trade partner Elmington Construction. This projects consists of over 60,000 sf of slab on grade and over 2,000 linear ft of cast in place walls. Our team utilized the Doka Framax Xlife system, specifically optimized for gang forming. This system allows for quick and efficient form removal—reducing labor time and improving overall project efficiency.
Central Berkeley Wastewater Treatment Plant (WWTP)
This project included over 1,000 tons of reinforcing steel installed, 4,000 cubic yards of concrete poured, elevated cast-in-place decks, radius walls, straight walls
For the radius walls, our team utilized the MEVA Adjustable Radius (MAR) formwork system, a customizable solution specifically designed for water and wastewater treatment structures requiring precision curved geometry.
The MAR system arrived on site in pre-assembled units with the radius already calibrated, allowing our crews to quickly offload, pick, and set panels directly into position with the crane. Compared to traditional radius forming systems that often require hundreds of loose components and extensive field assembly, this approach significantly reduced setup time, labor requirements, and overall installation complexity.
The ability to easily adjust radius settings between pours also provides ongoing efficiency as work advances around the structure.
We also utilized MEVA Formwork Systems 32 shoring tower system. This formwork system delivers both strength and efficiency — featuring an aluminum frame with a load capacity of 32 kips (142 kN) while weighing just 49 lbs per frame. Its foldable design allows for easy relocation without dismantling the entire unit, improving safety, productivity, and cycle time on site.
Progress like this keeps critical infrastructure moving forward.
“Strong communities require strong infrastructure”
Seabrook Island, SC WWTP
Successful water and wastewater infrastructure projects require a partner who understands what’s at stake and has the capabilities to deliver.
At Evans Contracting our teams engage early, plan strategically, and self-perform critical scopes of work to maintain safety, quality, and schedule certainty.
University of Tennessee - Chattanooga Health SCience Building
Evans Contracting Group is excited to announce our latest project with The Christman Company in Chattanooga, TN. The UTC Health Sciences Building will be located at the corner of Palmetto and East 3rd streets. This new building will be approximately 90,000 square feet with state-of-the-art classrooms and a cutting-edge simulation lab. The new facility will also allow for a 152 percent enrollment increase in the School of Nursing, which currently accepts approximately 50 percent of applicants and turns down eligible students due to space and class size limitations.
Felix C. Davis Wastewater Treatment Plant (WWTP)
Evans Contracting Group is finishing up shoring and decking at the Felix C. Davis Wastewater Treatment Plant (WWTP) for Harper General Contractors
This project will replace aging, energy-intensive blowers and diffuser systems, improving operational efficiency and long-term reliability for the community.
We’re proud to support upgrades that strengthen essential infrastructure and keep systems running for generations to come.
“Strong communities require strong infrastructure”
Walker Landing
We recently finished up site concrete at Walker Landing in Elizabeth City, NC, working alongside The Walsh Group - Walsh Construction & Archer Western. Great work to Furman Walker and the crew on the excellent craftsmanship especially on the false curb-edged joints. These joints aren’t just decorative; they’re intentionally cut control joints designed to manage concrete shrinkage and expansion, ensuring cracks occur cleanly and in a controlled line rather than randomly. Quality details like this make all the difference.
HCA Cane Bay FSER
Evans Contracting Group is excited to announce our latest project with Vannoy Construction in Summerville, South Carolina! We look forward to get this one started and continuing to strengthen our partnership with the James R. Vannoy & Sons Construction Company, Inc. team on a successful project together.
Rowland, NC Wastewater Treatment Plant (WWTP)
Evans Contracting Group is proud to announce our latest started project with Harper General Contractors on the Rowland, NC WWTP project.
The Town of Rowland’s wastewater Improvements will help eliminate large volumes of extraneous flow in the system and help end the sewer line moratorium.
This investment will help make needed improvements to the town’s wastewater system, so Rowland and Robeson County can be an even stronger, healthier and more resilient place for all.
“Strong communities require strong infrastructure”
AC Marriott
We are thrilled to be the concrete services partner supporting Grace Construction to build this new hotel in the heart of downtown Knoxville.
BMW H40 Pss Conveyor
Evans Contracting Group is excited to announce our latest awarded project with Pyramid Contracting, LLC in Greer, South Carolina at the upstates largest automotive manufacturer. We look forward to get this one started and continuing to strengthen our partnership with the Greenville Pyramid team on a successful project together.
North Berkley Public Safety Campus
Evans Contracting Group is excited to get our newest project started with Monteith Construction Corp. at the North Berkeley Public Safety Campus in Bonneau, SC. The approximately 16,800-square-foot facility will house the North Berkeley Fire District, a substation for the Berkeley County Sheriff's Office, and an EMS substation. It will also serve as a backup 911 center and will include a helicopter pad and boats for responding to emergencies on Lake Moultrie and the Santee River. The campus is expected to be completed in May 2026
Hilton Head RO Expansion
Evans Contracting Group is starting the week strong with a mat slab placement for the sodium hypochlorite bulk storage tanks at the Hilton Head RO Expansion project for Harper General Contractors Proud to support the progress on this critical infrastructure upgrade.